Project wind farm Volkerak (The Netherlands)

Commissioned by Innogy, HST Energy exchanged two main axes at the Volkerak wind farm in the Netherlands.

The relevant main axles were effete and have been replaced for remanufactured ones. To replace the main axles, it was necessary to remove the rotor and bring down the entire driveline and then to the ground to convert the gearbox to the new axle. Shortly after the switch the turbines were fault-free and operational.